Inspections
The most recent comprehensive inspection of PARK VIEW CARE CENTER occurred on August 08, 2024, 7 violations of state standards were cited.
Findings
(May include findings from previous inspections)
Health Code
| Date | Corrected | State Violation Cited |
|---|---|---|
| 10/25/2023 | 12/5/2023 | The facility failed to the meet Life Safety Code requirements for an existing Health Care Occupancy. |
| 10/25/2023 | 12/5/2023 | The facility failed to make sure the emergency generator met required standards, was protected from the weather and had an alternate fuel source if it relied on natural gas from a utility company. |
| 10/25/2023 | 12/5/2023 | The facility failed to make sure bedroom doors can close and latch in an emergency. |
| 10/25/2023 | 12/5/2023 | The facility failed to make sure air conditioners shutoff to prevent the spread of smoke when the fire alarm goes off. |
| 10/25/2023 | 12/5/2023 | The facility failed to make sure smoke barriers are constructed correctly to prevent the spread of smoke. |
| 10/25/2023 | 12/5/2023 | The facility failed to provide enough light in rooms based on how the room is used. |
| 10/25/2023 | 12/5/2023 | The facility failed to heating and air condition systems are installed correctly and operate safely. |
Life Safety Code
| Date | Corrected | State Violation Cited |
|---|---|---|
| 10/25/2023 | 12/5/2023 | The facility failed to the meet Life Safety Code requirements for an existing Health Care Occupancy. |
| 10/25/2023 | 12/5/2023 | The facility failed to make sure the emergency generator met required standards, was protected from the weather and had an alternate fuel source if it relied on natural gas from a utility company. |
| 10/25/2023 | 12/5/2023 | The facility failed to make sure bedroom doors can close and latch in an emergency. |
| 10/25/2023 | 12/5/2023 | The facility failed to make sure air conditioners shutoff to prevent the spread of smoke when the fire alarm goes off. |
| 10/25/2023 | 12/5/2023 | The facility failed to make sure smoke barriers are constructed correctly to prevent the spread of smoke. |
| 10/25/2023 | 12/5/2023 | The facility failed to provide enough light in rooms based on how the room is used. |
| 10/25/2023 | 12/5/2023 | The facility failed to heating and air condition systems are installed correctly and operate safely. |
Enforcement Actions
No enforcement actions found.